West Amazon Drive - Hilyard Street to Fox Hollow Road

Completed: No
Jurisdiction: City of Eugene Mode: Road
Bike
Pedestrian
Description:

• This section of West Amazon Drive is a Major Collector between Hilyard Street and Fox Hollow Road in the Southeast Neighbors Neighborhood.
• This street has severe cracking due to age, heavy traffic loading and poor subgrade conditions and needs to be reconstructed.
• Work will also include reconstructing concrete curb, gutter and sidewalk access ramps.
• This project is primarily intended to repair the street pavement, but other elements may be added to the project as the scope develops.

Business Access During Construction? Yes
Traffic Impacts:

• Drivers should expect street and lane closures and lane shifts during construction with possible one way traffic during some phases of construction.
• Bicyclists should expect to merge with motor vehicle traffic depending on available lane widths during construction.
• With any construction, drivers should expect equipment and workers in the roadway leading to congestion and delays during the work.

Work Schedule:

• This project is scheduled for construction in the summer of 2018.
• Prior to the start of street construction, the City’s arborists may be on-site trimming trees to prevent overhead limbs from being damaged by construction equipment.
• Also prior to construction, utility companies (water, electricity, gas) may be on-site adjusting their facilities in order to avoid conflicts with the work and prevent damage to their facilities.

Funding:

• The major source of funding is from the voter approved 2012 Pavement Bond Measure.

Contact: Josh Pinkham
Project Notes:

• Online road reports (during construction) at www.eugene-or.gov/traffic.
• On Twitter (during construction) at www.Twitter.com/EugenePW.

 